Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberELE01-03021
StatusFinaled
Name CUSTOM ELECTRIC
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT-ELEVATED ROAD
Customer Number 
ePlanReview 
Description
8/28/01//dept of aviation & transporation/terminal area roadway/conduit, wiring devices, lighting, controls, lights/initial cert of value $366,340/mls 5-14-03 FINAL ADDITIONAL VALUE $ 35,163.00
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notification5/8/20035/8/20035/14/2003 DONE
First Notice has not been responded to.
First Notice 2/12/20035/8/2003 DONE
Details
DOC - Permit Finaled2/12/20032/12/20032/12/2003PPASS
DetailsJack Frank
Finaled by inspector at 2/12/2003 4:22:08 PM
Final2/11/20032/12/20032/12/2003APASS
DetailsJack Frank
RE-INSP NATE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok card signed 2/12/2003 4:22:03 PM
Final1/29/20031/29/20031/29/2003PFAIL
DetailsJack Frank
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung cor. $42.00 fee due posted met contractor strap LFMC, 12inches of boxes RMC 3ft of boxes, tighten all clamps and bond bushings, install bond bushins all RMC nipples out of back of boxes 1/29/2003 3:59:48 PM
Electrical Rough-In12/6/200212/6/200212/6/2002PPART
DetailsJack Frank
conference with contractor concerning correction notice posted
Final11/14/200211/14/200211/14/2002PFAIL
DetailsJack Frank
###-#### russell job not ready partial correction posted 110.3(B) install grd bushings on all conduits entering non metallic boxes manufactrues instructionssupport all raceways and secure within 3 ft of boxes 314.25,250.110,406.5 grd all covers u/g jboxes 11/14/2002 6:18:01 PM
Electrical Rough-In10/16/200210/17/200210/17/2002PPASS
DetailsJack Frank
###-#### UNDER GRND. ok 10/17/2002 6:37:48 PM
Electrical Rough-In10/16/200210/16/200210/16/2002PPART
DetailsJack Frank
underground cover -east end of roadway -casey -###-#### ok 10/16/2002 5:14:33 PM
Electrical Rough-In10/9/200210/10/200210/10/2002APART
DetailsJack Frank
RUSSEL; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok 10/10/2002 2:16:00 PM
Electrical Rough-In8/30/20029/3/20029/3/2002PPASS
DetailsJack Frank
###-#### u/g conduit ok 9/3/2002 6:15:57 PM
Electrical Rough-In8/26/20028/27/20028/27/2002APART
DetailsJack Frank
###-#### u/g ok called contractor shall not ID 6, or smaller neutrals or equipment grds 8/27/2002 3:16:17 PM
Electrical Rough-In7/18/20027/19/20027/19/2002PPART
DetailsJack Frank
RUSSELL; Phone #: ###-#### u/g ok on dirt bank south of new raised road, in front of new terminal 7/19/2002 4:19:28 PM
Electrical Rough-In7/11/20027/12/20027/12/2002APART
DetailsJack Frank
russel ###-#### part for u/g conduit ok 7/12/2002 12:17:27 PM
   7/11/2002 DONE
DetailsDarla L Downs
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to baggage system installation.
(any questions contact John Menard at ###-####)

(5-20-02) Please override this tag for all activities associated with permit BLD02-01037. CJW Reason for OverRide:
Electrical Rough-In6/10/20026/11/20026/11/2002PFAIL
DetailsMike Kinnear
underground on westside of bridge--russell- ###-#### called left message need to talk to contractor over 360 degrees of bend ? 6/11/2002 6:29:46 PM
Electrical Rough-In6/11/20026/11/20026/11/2002PPART
DetailsJack Frank
u/g ok partial
Override - Parcel Holds  6/10/2002  
Electrical Rough-In6/5/20026/6/20026/6/2002PPASS
DetailsTim McCullough
###-####- russell
pour ri ok 6/6/2002 11:24:55 AM
Override - Parcel Holds  6/5/2002  
Electrical Rough-In5/24/20025/28/20025/28/2002APASS
DetailsTim McCullough
UNDERGROUND COVER ###-#### RUSSEL
ok cover parking area
5/28/2002 1:55:57 PM
   5/24/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to plan modifications in process involving future work.
CCD 008 Plan Modification includes:
1. Space added:
a. 3,215 S.F. first floor
b. 4,161 S.F. second floor
c. 1,533 S.F. third floor
d. basement
2. Security checkpoint has been rearranged to increase number of check points.
3. Relocation of restrooms
4. Meeter/greeter lobby was added at the second floor adjacent to security checkpoint as a holding area for people waiting for passengers.
5. Rental car lobby at the first floor was expanded in the area
below the meeter/greeter lobby on the second floor.
6. A third floor mech. room was added to support the additional building area.
CCD 011 Plan Modification includes:
1. Modifications to current basement layout (under to accomodate airport storage needs & additional space needs for airport police force.
(any questions contact John Menard at ###-####)

(5-20-02) Please override this tag for all activities associated with permit BLD02-01037. CJW Reason for OverRide:
Electrical Rough-In5/16/20025/17/20025/17/2002PPART
DetailsJack Frank
###-#### underground for 5 pole bases ok 5/17/2002 4:32:27 PM
Override - Parcel Holds  5/16/2002  
Electrical Rough-In5/3/20025/3/20025/3/2002PPART
DetailsPat Lass
for underground- justin -###-####
Override - Parcel Holds  5/3/2002  
Override - Parcel Holds  5/3/2002  
Final4/29/20024/30/20024/30/2002APART
DetailsJack Frank
###-#### RUSSELL u/g for fixtures in raised roadway 4/30/2002 11:06:11 AM
Override - Parcel Holds  4/29/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to plan modifications in process involving future work.
CCD 008 Plan Modification includes:
1. Space added:
a. 3,215 S.F. first floor
b. 4,161 S.F. second floor
c. 1,533 S.F. third floor
d. basement
2. Security checkpoint has been rearranged to increase number of check points.
3. Relocation of restrooms
4. Meeter/greeter lobby was added at the second floor adjacent to security checkpoint as a holding area for people waiting for passengers.
5. Rental car lobby at the first floor was expanded in the area
below the meeter/greeter lobby on the second floor.
6. A third floor mech. room was added to support the additional building area.
CCD 011 Plan Modification includes:
1. Modifications to current basement layout (under to accomodate airport storage needs & additional space needs for airport police force.
(any questions contact John Menard at ###-####)
Reason for OverRide:
Electrical Rough-In4/1/20024/2/20024/2/2002PFAIL
DetailsJack Frank
ok to cover- russell ###-####-
met with contractor at job site corrections noted 344.26,352.26 over 360 degrees of bends in u/g conduit 4/2/2002 4:04:19 PM
Override - Parcel Holds  4/1/2002  
Electrical Rough-In3/27/20023/27/20023/27/2002PPART
DetailsJack Frank
###-#### RUSSEL u/g conduits ok for cover 3/27/2002 6:02:35 PM
Override - Parcel Holds  3/27/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: PLAN MODIFICATION (BLD00-03428)
1. Space added:
a. 3,215 S.F. first floor
b. 4,161 S.F. second floor
c. 1,533 S.F. third floor
d. basement
2. Security checkpoint has been rearranged to ^ number of chech points.
3. Relocation of restrooms
4. Meeter/greeter lobby was added at the second floor adjacent to security checkpoint as a holding area for people waiting for passengers.
5. Rental car lobby at the first floor was expanded in the area
below the meeter/greeter lobby on the second floor.
6. A third floor mech. room was added to support the additional builidng area.
7. Modifications to current basement layout (under construction) to accomodate airport storage needs & additional space needs for airport police force.
No inspections for the above modification. If any questions please call John Menard or Jim Storey. kmm Reason for OverRide:
Rough-In Permanent Service2/21/20022/22/20022/22/2002PPART
DetailsPat Lass
###-#### RUSSEL CALL 1ST beams ok 2/22/2002 4:54:43 PM
Electrical Rough-In2/15/20022/15/20022/15/2002PPASS
DetailsJim Schmer
cover insp --russell ###-#### call 1st before insp
ELE-Aging Inspection12/31/200112/31/200112/31/2001 PART
DetailsJack Frank
W S U C 12/31/2001 2:54:08 PM
Electrical Rough-In10/30/200110/30/200110/30/2001PPART
DetailsPat Lass
###-#### RUSSEL
Electrical Rough-In10/24/200110/25/200110/25/2001PPART
DetailsJack Frank
###-#### russ some pvc in concrete pour 10/25/2001 4:28:23 PM
Electrical Rough-In10/22/200110/23/200110/23/2001PNR
DetailsJack Frank
###-#### RUSSEL they will call when ready 10/23/2001 12:33:20 PM
Electrical Rough-In10/4/200110/4/200110/4/2001PPASS
DetailsJack Frank
russell-- ###-#### or scott ###-#### r/i columns ok 10/4/2001 4:13:51 PM
Electrical Rough-In9/28/200110/1/200110/1/2001APART
DetailsPat Lass
###-#### RUSS ###-#### colums ok 10/1/2001 10:35:18 AM
Electrical Rough-In9/26/20019/26/20019/26/2001PPART
DetailsJack Frank
###-#### russell 2 columns 9/26/2001 4:07:06 PM
Electrical Rough-In9/21/20019/21/20019/21/2001PPART
DetailsJack Frank
2 columns on west end Russell ###-#### ok 9/21/2001 4:19:11 PM
Electrical Rough-In9/18/20019/18/20019/18/2001PCANC
DetailsJack Frank
russell ###-#### contractor called and asked me to cancel inspection 9/18/2001 5:38:19 PM
Electrical Rough-In9/4/20019/5/20019/5/2001APART
DetailsJack Frank
r/i- russell ###-####- cover for columns ok 9/5/2001 9:47:49 AM
Electrical Rough-In8/30/20018/31/20018/31/2001APART
DetailsJack Frank
russell ###-#### r/i wiring in columns ok 8/31/2001 10:00:19 AM
Electrical Rough-In8/28/20018/28/20018/28/2001PPART
DetailsJack Frank
COVER INSP- TIM CELL ###-####- OR RICK ###-#### -CALL TIM 1ST BEFORE INSP 4 light standards ok 8/28/2001 3:23:25 PM
Application received  8/28/2001  
Issue & PRINT permit  8/28/2001 DONE