Final | 10/12/2001 | 10/15/2001 | 10/15/2001 | A | PASS |
Jack Frank
|
|
|
###-#### LYLE
|
DOC - Permit Finaled | 10/15/2001 | 10/15/2001 | 10/15/2001 | A | PASS |
Jack Frank
|
|
|
Finaled by inspector at 10/15/2001 10:05:42 AM
|
Rough-In Permanent Service | 10/12/2001 | 10/12/2001 | 10/12/2001 | P | FAIL |
Jack Frank
|
|
|
###-#### bud needs to bond hot and cold water pipes and tie to water pipe, and well casing with GEC from p/s not sub panel called 10/12/2001 2:18:16 PM
|
Permanent Service | 10/11/2001 | 10/11/2001 | 10/11/2001 | P | PASS |
Pat Lass
|
|
|
lyle- ###-#### per ser P/S O/H R Ok for power
check water ground on final 10/11/2001 2:22:02 PM
|
Issue & PRINT permit | | | 10/11/2001 | | DONE |
|
|
|
|
Application received | | | 10/11/2001 | | |
|
|
|
|