Permit Information
Permit NumberELE01-03965
StatusFinaled
Name CAPITOL ELECTRIC
Site Address 617 S 13TH ST
Project NameSHORELINE APARTMENTS
Customer Number 
ePlanReview 
Description
NEW 1200 AMP SERVICE, LIGHTING, RECEPTS & SWITCHES TO NEW 36 UNIT APARTMENT BUILDING PER INITIAL CERT OF VALUE $126,000
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final4/30/20025/1/20025/1/2002APASS
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 04/30/2002 at 15:34:21. Contact: ###-####. east-end apartments, (3-floors). 5/1/2002 8:59:47 AM
DOC - Permit Finaled5/1/20025/1/20025/1/2002APASS
DetailsMarv Burrus
Finaled by inspector at 5/1/2002 8:59:54 AM
Final4/29/20024/30/20024/30/2002APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 04/29/2002 at 15:57:48. Contact: ###-####. 1st and 2nd floors ok; 3rd floor not completed. 4/30/2002 10:10:57 AM
Rough-In Permanent Service1/9/20021/9/20021/9/2002PPASS
DetailsMarv Burrus
###-####. eastend. 2nd and 3rd level apt. units (18 total), ele r/i. main service/ meters for 27 apartment units.

p/s ug n capitol ele #3965-ok. 1/9/2002 1:37:02 PM
Override - People Holds  1/9/2002 DONE
DetailsAnnett Moore
Reason for Hold: ele01-02785 city owned job lh Reason for OverRide:
Override - Parcel Holds  1/9/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: All inspections can be made except the final and the issuance of the Certificate of Occupancy.
Prior to the final, the following must be completed and approved. Installation of a 4 hour area separation wall is required at the lobby area of the existing apartment building. A separate permit is requied to up grade the existing structure. Reason for OverRide:
Electrical Rough-In1/8/20021/8/20021/8/2002PPART
DetailsMarv Burrus
###-####. 1st level; apt. units (9 total), r/i. 1/8/2002 11:43:58 AM
Override - People Holds  1/8/2002 DONE
DetailsAnnett Moore
Reason for Hold: ele01-02785 city owned job lh Reason for OverRide:
Override - Parcel Holds  1/8/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: All inspections can be made except the final and the issuance of the Certificate of Occupancy.
Prior to the final, the following must be completed and approved. Installation of a 4 hour area separation wall is required at the lobby area of the existing apartment building. A separate permit is requied to up grade the existing structure. Reason for OverRide:
Override - People Holds  1/8/2002 DONE
DetailsAnnett Moore
Reason for Hold: ele01-02785 city owned job lh Reason for OverRide:
Override - Parcel Holds  1/8/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: All inspections can be made except the final and the issuance of the Certificate of Occupancy.
Prior to the final, the following must be completed and approved. Installation of a 4 hour area separation wall is required at the lobby area of the existing apartment building. A separate permit is requied to up grade the existing structure. Reason for OverRide:
Electrical Rough-In1/4/20021/4/20021/4/2002PPASS
DetailsMarv Burrus
###-####. 2nd and 3rd level westend apt units. 18 total. r/i ok 1/4/2002 10:41:26 AM
Override - People Holds  1/4/2002 DONE
DetailsAnnett Moore
Reason for Hold: ele01-02785 city owned job lh Reason for OverRide:
Override - Parcel Holds  1/4/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: All inspections can be made except the final and the issuance of the Certificate of Occupancy.
Prior to the final, the following must be completed and approved. Installation of a 4 hour area separation wall is required at the lobby area of the existing apartment building. A separate permit is requied to up grade the existing structure. Reason for OverRide:
Application received  11/21/2001  
Override - Parcel Holds  11/21/2001  
Issue & PRINT permit  11/21/2001 DONE