VOIDED CHANGE STATUS | | | 4/2/2002 | | DONE |
|
|
|
|
Electrical Rough-In | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | CANC |
Marv Burrus
|
|
|
r/i- ###-####- mel. owner hired contractor to do installation. he has pulled permit. 3/14/2002 2:51:53 PM
|
Electrical Rough-In | 2/22/2002 | 2/26/2002 | 2/26/2002 | A | PASS |
Marv Burrus
|
|
|
CONFERENCE ONLY ###-#### MEL branch circuits. 2/26/2002 10:11:56 AM
|
Application received | | | 12/10/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/10/2001 | | DONE |
|
|
|
|