Final | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 10:26:26. Contact: ###-####.
|
DOC - Permit Finaled | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PASS |
Joe Ray
|
|
|
Finaled by inspector at 3/12/2002 5:27:00 PM
|
Electrical Rough-In | 2/21/2002 | 2/22/2002 | 2/22/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/21/2002 at 14:52:11. Contact: ###-####.
|
Electrical Rough-In | 2/20/2002 | 2/21/2002 | 2/21/2002 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 13:36:58. Contact: ###-####.same corrections not made $42 fee due 2/21/2002 9:59:51 AM
|
Electrical Rough-In | 2/21/2002 | 2/21/2002 | 2/21/2002 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/21/2002 at 10:33:39. Contact: ###-####. corrections not made 2/21/2002 3:10:05 PM
|
Electrical Rough-In | 2/19/2002 | 2/20/2002 | 2/20/2002 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/19/2002 at 12:00:57. Contact: ###-####. Box fill protection 210.52 cut wire groundrod flush 2/20/2002 11:47:36 AM
|
Electrical Rough-In | 2/14/2002 | 2/14/2002 | 2/14/2002 | P | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 02/14/2002 at 10:30:22. Contact: ###-####. walls not completed wiring removed talked with contractor general needs to complete framing so electrical can finish wiring 2/14/2002 1:32:38 PM
|
Application received | | | 1/18/2002 | | |
|
|
|
|
Issue & PRINT permit | | | 1/18/2002 | | DONE |
|
|
|
|