Telephone Call | | | 12/10/2002 | | DONE |
|
|
|
|
DOC - Permit Finaled | 10/8/2002 | 10/8/2002 | 10/8/2002 | P | PASS |
Jack Frank
|
|
|
Finaled by inspector at 10/8/2002 5:56:24 PM
|
Final | 6/10/2002 | 6/10/2002 | 6/10/2002 | A | PASS |
Tim McCullough
|
|
|
final ok
|
Override - Parcel Holds | | | 6/10/2002 | | |
|
|
|
|
Electrical Rough-In | 6/4/2002 | 6/4/2002 | 6/4/2002 | P | PASS |
Tim McCullough
|
|
|
###-#### CHRIS
|
| | | 6/4/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to plan modifications in process involving future work.
CCD 008 Plan Modification includes:
1. Space added:
a. 3,215 S.F. first floor
b. 4,161 S.F. second floor
c. 1,533 S.F. third floor
d. basement
2. Security checkpoint has been rearranged to increase number of check points.
3. Relocation of restrooms
4. Meeter/greeter lobby was added at the second floor adjacent to security checkpoint as a holding area for people waiting for passengers.
5. Rental car lobby at the first floor was expanded in the area
below the meeter/greeter lobby on the second floor.
6. A third floor mech. room was added to support the additional building area.
CCD 011 Plan Modification includes:
1. Modifications to current basement layout (under to accomodate airport storage needs & additional space needs for airport police force.
(any questions contact John Menard at ###-####)
(5-20-02) Please override this tag for all activities associated with permit BLD02-01037. CJW Reason for OverRide:
|
Application received | | | 4/9/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 4/9/2002 | | |
|
|
|
|
Issue & PRINT permit | | | 4/9/2002 | | |
|
|
|
|