Final | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/21/2002 at 10:46:08. Contact: ###-####. ok 5/21/2002 4:30:59 PM
|
DOC - Permit Finaled | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | PASS |
Jack Frank
|
|
|
Finaled by inspector at 5/21/2002 4:31:03 PM
|
Final | 5/17/2002 | 5/20/2002 | 5/20/2002 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/17/2002 at 14:17:32. Contact: ###-####. cor. posted . called.314.16 box fill island. 210.8 line&load. 5/20/2002 11:59:08 AM
|
Rough-In Permanent Service | 4/26/2002 | 4/29/2002 | 4/29/2002 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 04/26/2002 at 17:32:43. Contact: ###-####. r/i ok cor. made need to check counter outlet spacing at final
p/s o/h rec. ok 4/29/2002 10:06:20 AM
|
Rough-In Permanent Service | 4/26/2002 | 4/26/2002 | 4/26/2002 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 04/26/2002 at 11:17:09. Contact: ###-####. cor. posted called 250.50,52,56,104
shall grd or bond water system too p/s not sub panel, 210.52(ABC) needs guy kit or bolt , wiring covered before inspection partion correction only need access too walls for inspection 4/26/2002 3:35:19 PM
|
Rough-In Permanent Service | 4/26/2002 | 4/26/2002 | 4/26/2002 | P | FAIL |
Jack Frank
|
|
|
correctons not made, more violations created, job not ready
|
Application received | | | 4/24/2002 | | |
|
|
|
|
Issue & PRINT permit | | | 4/24/2002 | | DONE |
|
|
|
|