Rough-In Permanent Service | 5/8/2002 | 5/9/2002 | 5/9/2002 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 13:38:39. Contact: ###-####. r/i ok
p/s u/g needs meter set ok 5/9/2002 12:02:30 PM
|
Final | 5/9/2002 | 5/9/2002 | 5/9/2002 | A | PART |
Jack Frank
|
|
|
called some units locked will complete final when I do my PM inspection there
|
DOC - Permit Finaled | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | PASS |
Jack Frank
|
|
|
Finaled by inspector at 5/9/2002 12:02:46 PM
|
Rough-In Permanent Service | 5/7/2002 | 5/8/2002 | 5/8/2002 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 11:40:33. Contact: ###-####. cor. posted met with owner 358.30, 250.24(A((5), 210.70 needs light fixture for furnace rm, 200.7 110.3(B) use manufactures breakers, 110,26 clearence for sub panel, 300.14 5/8/2002 2:17:49 PM
|
Application received | | | 5/1/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/1/2002 | | DONE |
|
|
|
|