Final | 3/13/2003 | 3/13/2003 | 3/13/2003 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 3/13/2003 at 8:20:51 AM. Contact: ###-####. ok final survey nrrds inuse covers 3/13/2003 3:15:58 PM
|
DOC - Permit Finaled | 3/13/2003 | 3/13/2003 | 3/13/2003 | P | PASS |
Mike Kinnear
|
|
|
Finaled by inspector at 3/13/2003 3:16:13 PM
|
PostCard Mailed | | | 3/5/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 3/5/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 2/1/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 1/4/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
Electrical Rough-In | 6/27/2002 | 6/28/2002 | 6/28/2002 | A | PASS |
Joe Ray
|
|
|
###-#### BILL
|
Electrical Rough-In | 6/26/2002 | 6/27/2002 | 6/27/2002 | A | FAIL |
Tim McCullough
|
|
|
alan ###-####
correction ceiling box on porch needs to be flush.
called contractor,call for inspect. before installing fixture. 6/27/2002 11:14:40 AM
|
Application received | | | 6/26/2002 | | |
|
|
|
|
Issue & PRINT permit | | | 6/26/2002 | | |
|
|
|
|