Final | 10/27/2002 | 10/28/2002 | 10/28/2002 | P | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 10/27/2002 at 20:36:32. Contact: .
final/ok 10/28/2002 12:27:39 PM
|
DOC - Permit Finaled | 10/28/2002 | 10/28/2002 | 10/28/2002 | P | PASS |
Tim McCullough
|
|
|
Finaled by inspector at 10/28/2002 12:27:43 PM
|
Final | 9/25/2002 | 9/25/2002 | 9/25/2002 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/25/2002 at 07:07:35. Contact: .
|
Electrical Rough-In | 9/15/2002 | 9/16/2002 | 9/16/2002 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/15/2002 at 21:39:18. Contact: . electrode ok for concrete cover 9/16/2002 4:34:14 PM
|
Electrical Rough-In | 9/10/2002 | 9/11/2002 | 9/11/2002 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/10/2002 at 20:48:16. Contact: . cor. posted 300.4(A)(1) and (D), 310.16 14on 20 amp, 314.28 (A)(2), 330.30(C), 250.52(A)(3) 9/11/2002 4:57:12 PM
|
Electrical Rough-In | 7/17/2002 | 7/18/2002 | 7/18/2002 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/17/2002 at 21:17:08. Contact: ###-####. conference ok for moved garage 7/18/2002 5:49:58 PM
|
Application received | | | 6/27/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/27/2002 | | DONE |
|
|
|
|