Third Notice ELE | 12/22/2003 | 12/22/2003 | 2/3/2004 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notification | 5/8/2003 | 5/8/2003 | 12/22/2003 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 9/20/2002 | 5/8/2003 | | DONE |
|
|
|
|
Final | 8/27/2002 | 8/27/2002 | 8/27/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 10:22:46. Contact: ###-####.
|
DOC - Permit Finaled | 8/27/2002 | 8/27/2002 | 8/27/2002 | P | PASS |
Joe Ray
|
|
|
Finaled by inspector at 8/27/2002 4:28:58 PM
|
Rough-In Permanent Service | 7/15/2002 | 7/15/2002 | 7/15/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/15/2002 at 09:01:30. Contact: ###-####. r/i ok
p/s o/h new ok 7/15/2002 4:39:36 PM
|
Rough-In Permanent Service | 7/12/2002 | 7/12/2002 | 7/12/2002 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/12/2002 at 10:51:03. Contact: ###-####. cor. posted called left message 230.24(A) exception #3 needs 18 inches for drip loop from roof, 110.3(B) vacuum outlets state non metallic raceways only, 312.2 needs hub for PVC exiting top of service panel, strap rigid and pvc 7/12/2002 5:18:24 PM
|
Application received | | | 7/9/2002 | | |
|
|
|
|
Issue & PRINT permit | | | 7/9/2002 | | DONE |
|
|
|
|