Final | 8/8/2002 | 8/9/2002 | 8/9/2002 | A | PASS |
Tim McCullough
|
|
|
###-#### dave
ps/ug/reconn./ok/final 8/9/2002 10:46:50 AM
|
DOC - Permit Finaled | 8/9/2002 | 8/9/2002 | 8/9/2002 | A | PASS |
Tim McCullough
|
|
|
Finaled by inspector at 8/9/2002 10:46:54 AM
|
Issue & PRINT permit | | | 8/8/2002 | | DONE |
|
|
|
|
Final | 8/2/2002 | 8/6/2002 | 8/6/2002 | A | FAIL |
Jack Frank
|
|
|
###-#### cor. posted called no violations to be retained manufactures breaker only
(sub panel) install cable clamp, and seal K Os and isolate grds and nuetrals shall either grd, or bond as 250.52,and 104, protect emt in earth,and bond it or replace with #80 PVC 8/6/2002 6:36:21 PM
|
Application received | | | 8/2/2002 | | |
|
|
|
|