Information based on query as of Saturday, July 20, 2024.
Permit Information
Permit NumberELE02-03183
StatusExpired
Name CAMAS ELECTRIC CONTRACTING
Site Address 2004 N 10TH ST
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PostCard Mailed  10/1/2003 SENT
PostCard has been mailed requesting inspection.
PostCard Mailed  5/10/2003 SENT
PostCard has been mailed requesting inspection.
Electrical Rough-In10/21/200210/21/200210/21/2002PFAIL
DetailsPat Lass
###-#### MARK
250.148 Continuity and Attachment of Equipment Grounding Conductors to Boxes.
Where circuit conductors are spliced within a box, or terminated on equipment within or supported by a box, any separate equipment grounding conductors associated with those circuit conductors shall be spliced or joined within the box

314.43 Nonmetallic Boxes.
Provisions for supports or other mounting means for nonmetallic boxes shall be outside of the box

300.4 Protection Against Physical Damage.
Where subject to physical damage, conductors shall be adequately protected.
(D) Cables and Raceways Parallel to Framing Members.

300.14 Length of Free Conductors at Outlets, Junctions, and Switch Points.
At least 150 mm (6 in.) of free conductor

314.16 Number of Conductors in Outlet, Device, and Junction Boxes, and Conduit Bodies.
Boxes and conduit bodies shall be of sufficient size to provide free space for all enclosed conductors.
10/21/2002 3:42:10 PM
Electrical Rough-In10/21/200210/21/200210/21/2002PPASS
DetailsJim Schmer
Electrical Rough-In10/17/200210/18/200210/18/2002AFAIL
DetailsMike Kinnear
###-#### corrections NEC210.52(A)(1)&(2)--300.4(D) 10/18/2002 11:08:38 AM
Application received  10/14/2002  
Issue PAID IN FULL permit  10/14/2002 DONE