Telephone Call | | | 3/20/2003 | | DONE |
|
|
|
|
Final | 3/17/2003 | 3/19/2003 | 3/18/2003 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/17/2003 at 7:35:38 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 18 2003 8:18AM.
|
Final | 3/18/2003 | 3/18/2003 | 3/18/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/18/2003 at 8:19:25 AM. Contact: ###-####. ok no card at job site 3/18/2003 2:13:18 PM
|
DOC - Permit Finaled | 3/18/2003 | 3/18/2003 | 3/18/2003 | P | PASS |
Jack Frank
|
|
|
Finaled by inspector at 3/18/2003 2:13:23 PM
|
Final | 3/13/2003 | 3/13/2003 | 3/13/2003 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/13/2003 at 7:51:55 AM. Contact: ###-####. cor. posted called lock out WH, #10 equip grd WH, bond screw a/c disconnect, wire signs, 240.81 breaker in
sq D panel up side down off wrong poition 3/13/2003 2:24:53 PM
|
Electrical Rough-In | 3/7/2003 | 3/7/2003 | 3/7/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/7/2003 at 7:25:20 AM. Contact: ###-####. ceiling ok 3/7/2003 10:20:56 AM
|
Electrical Rough-In | 3/6/2003 | 3/6/2003 | 3/6/2003 | P | NR |
Jack Frank
|
|
|
WAYNE CELING; Phone #: ###-#### Internet Inspection Request from: Darla Downs met with contractor job not ready he will reschedule 3/6/2003 12:49:23 PM
|
Electrical Rough-In | 2/6/2003 | 2/7/2003 | 2/7/2003 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/6/2003 at 3:08:56 PM. Contact: ###-####. 300.4 11/4 for MC 2/7/2003 8:50:38 AM
|
Electrical Rough-In | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/7/2003 at 9:03:43 AM. Contact: ###-####. ceiling ok 2/7/2003 12:36:36 PM
|
Application received | | | 2/3/2003 | | |
|
|
|
|
Issue & PRINT permit | | | 2/3/2003 | | |
|
|
|
|