Second Notification | 5/8/2003 | 5/8/2003 | 5/28/2003 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/20/2003 | 5/8/2003 | | DONE |
|
|
|
|
DOC - Permit Finaled | 3/20/2003 | 3/20/2003 | 3/20/2003 | P | PASS |
Joe Ray
|
|
|
Finaled by inspector at 3/20/2003 2:10:54 PM
|
Final | 3/19/2003 | 3/20/2003 | 3/20/2003 | A | CANC |
Joe Ray
|
|
|
dan ###-#### 3/19/2003 3:08:32 PM
|
Final | 3/20/2003 | 3/20/2003 | 3/20/2003 | P | PASS |
Joe Ray
|
|
|
dan ###-#### 3/20/2003 9:50:39 AM
|
Final | 3/18/2003 | 3/19/2003 | 3/19/2003 | A | FAIL |
Jack Frank
|
|
|
Installed a new 30 amp MCC bucket in the panel room at the Truss Plant, labled it "Southwest Gantry". Pulled new #8 thhn ckt. wires into existing underfloor conduit to the West wall of the plant, set a new disconnect and ran 3/4" conduit to ceiling and set a j-box. Ran cord from this j-box to the Gantry Control panel; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell called need to meet contractor at job site no access swittches locked and plant in production 3/19/2003 10:23:54 AM
|
Final | 3/19/2003 | 3/19/2003 | 3/19/2003 | P | CANC |
Joe Ray
|
|
|
Call Dan To meet at jobsite for walk thru.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
Application received | | | 3/17/2003 | | |
|
|
|
|
Issue & PRINT permit | | | 3/17/2003 | | DONE |
|
|
|
|