Final | 5/20/2003 | 5/20/2003 | 5/20/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/20/2003 at 9:05:01 AM. Contact: ###-####. ok 5/20/2003 2:06:45 PM
|
DOC - Permit Finaled | 5/20/2003 | 5/20/2003 | 5/20/2003 | P | PASS |
Jack Frank
|
|
|
Finaled by inspector at 5/20/2003 2:06:49 PM
|
Electrical Rough-In | 4/7/2003 | 4/8/2003 | 4/8/2003 | A | PASS |
Jim Schmer
|
|
|
8 am p/s o/h new - ok 4/8/2003 8:33:10 AM
|
Electrical Rough-In | 4/7/2003 | 4/7/2003 | 4/7/2003 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/7/2003 at 7:02:12 AM. Contact: ###-####. cor. not made still needs to correct 11/4 and nail plates called left message 4/7/2003 9:06:30 AM
|
Electrical Rough-In | 4/3/2003 | 4/3/2003 | 4/3/2003 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/3/2003 at 9:47:37 AM. correction not made 300.4(A)(1) and (D) note siders are using nail that are too long damaging wire and boxes no r/i until all siding is installed met with contractor siders informed of problem, and will not change and use shorter nails 4/3/2003 2:33:30 PM
|
Electrical Rough-In | 4/1/2003 | 4/2/2003 | 4/2/2003 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/1/2003 at 11:57:06 AM. Contact: ###-####. all corrections not made and new one added $42.00 reinspection fee due called 4/2/2003 8:44:51 AM
|
Rough-In Permanent Service | 3/31/2003 | 3/31/2003 | 3/31/2003 | P | FAIL |
Jack Frank
|
|
|
###-#### jerry cor. posted called left message, 300.4 (A)(1),(D). 300.14 short grd wires, 250.24 (A), and (A)(5) terminate at service not sub panel and isolate grd and neutrals at sub panels 3/31/2003 2:57:11 PM
|
Issue & PRINT permit | | | 3/31/2003 | | DONE |
|
|
|
|
Application received | | | 3/31/2003 | | |
|
|
|
|