Final | 8/12/2003 | 8/13/2003 | 8/13/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 8/12/2003 at 4:30:36 PM. Contact: ###-####.
|
DOC - Permit Finaled | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | PASS |
Joe Ray
|
|
|
Finaled by inspector at 8/13/2003 11:45:35 AM
|
Electrical Rough-In | 8/6/2003 | 8/7/2003 | 8/7/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 8/6/2003 at 4:43:24 PM. Contact: ###-####. potting ok 8/7/2003 10:00:09 AM
|
Electrical Rough-In | 7/24/2003 | 7/25/2003 | 7/25/2003 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/24/2003 at 1:22:27 PM. Contact: ###-####. u/g conduit ok 7/25/2003 9:39:47 AM
|
Electrical Rough-In | 7/22/2003 | 7/22/2003 | 7/22/2003 | P | PASS |
Joe Ray
|
|
|
###-#### lee pool bonding pool bond ok 7/22/2003 1:55:37 PM
|
Issue & PRINT permit | | | 7/22/2003 | | DONE |
|
|
|
|
Application received | | | 7/22/2003 | | |
|
|
|
|