Second Notice ELE | 11/20/2003 | 11/20/2003 | 11/20/2003 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice Sent | | 11/5/2003 | 11/20/2003 | | DONE |
|
|
|
|
DOC - Permit Finaled | 11/5/2003 | 11/5/2003 | 11/5/2003 | A | PASS |
Pat Lass
|
|
|
Finaled by inspector at 11/5/2003 8:45:05 AM
|
Rough-In Permanent Service | 11/4/2003 | 11/5/2003 | 11/5/2003 | A | PASS |
Pat Lass
|
|
|
We installed a new 400amp 3phase Main Bkr. panel in the new Recieving Bay Bldg. and fed it from the 1600amp switchgear in the other bldg. The Electrical contractor who is wiring the new bldg. is to ground this new 400amp panel as part of his contract with Meadow Gold. We installed a new 30 HP pump-plant-panel and fed it from the 400amp panel. We are done with our portion of the project, and all further wiring will be done by the other contractor under his permit.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
Electrical Rough-In | 10/1/2003 | 10/2/2003 | 10/2/2003 | A | PASS |
Pat Lass
|
|
|
Please inspect the 4" and 3" PVC conduits in the trench between the old building and the new building, to allow backfill. Thanks !!!; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
Application received | | | 10/1/2003 | | |
|
|
|
|
Issue permit | | | 10/1/2003 | | DONE |
|
|
|
|