Third Notice ELE | 2/9/2004 | 2/9/2004 | 2/18/2004 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice ELE | 1/22/2004 | 1/22/2004 | 2/9/2004 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice Sent | | 12/18/2003 | 1/22/2004 | | DONE |
|
|
|
|
DOC - Permit Finaled | 12/18/2003 | 12/18/2003 | 12/18/2003 | A | PASS |
Pat Lass
|
|
|
Finaled by inspector at 12/18/2003 10:51:14 AM
|
Final | 12/17/2003 | 12/18/2003 | 12/18/2003 | A | PASS |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Monty Adkinson
|
Electrical Rough-In | 12/15/2003 | 12/16/2003 | 12/16/2003 | A | FAIL |
Pat Lass
|
|
|
Monte ###-####
300.11 Securing and Supporting.
(A) Secured in Place. Raceways, cable assemblies, boxes, cabinets, and fittings shall be securely fastened in place.
250.148 Continuity and Attachment of Equipment Grounding Conductors to Boxes.
(A) Metal Boxes. A connection shall be made between the one or more equipment grounding conductors and a metal box
314.22 Exposed Surface Extensions.
314.17 (b)
open ceiling 12/16/2003 10:17:25 AM
|
Issue permit | | | 12/15/2003 | | DONE |
|
|
|
|
Application received | | | 12/15/2003 | | |
|
|
|
|