Final | 6/2/2004 | 6/2/2004 | 6/2/2004 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 6/2/2004 at 6:57:52 AM. Contact: ###-####.
signed card but it did not include the generator. electrical permit includes generator. 6/2/2004 2:44:36 PM
|
DOC - Permit Finaled | 6/2/2004 | 6/2/2004 | 6/2/2004 | P | PASS |
Pat Lass
|
|
|
Finaled by inspector at 6/2/2004 2:44:39 PM
|
Conference | 5/19/2004 | 5/20/2004 | 5/20/2004 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/19/2004 at 3:37:06 PM. Contact: ###-####.
grounding electrode conductors to be installed correctly at both structures 5/20/2004 10:29:46 AM
|
Conference | 5/14/2004 | 5/14/2004 | 5/14/2004 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/14/2004 at 7:09:43 AM. Contact: ###-####.
I have questions about listing building and gen.
disconnects at building
and ungrounded sys. 5/14/2004 11:34:43 AM
|
ELE-Aging Inspection | 5/3/2004 | 5/3/2004 | 5/3/2004 | | NR |
Pat Lass
|
|
|
suc 5/7/2004 3:20:12 PM
|
Electrical Rough-In | 2/13/2004 | 2/13/2004 | 2/13/2004 | P | PASS |
Pat Lass
|
|
|
allen; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
Electrical Rough-In | 2/11/2004 | 2/12/2004 | 2/12/2004 | A | PART |
Pat Lass
|
|
|
allen; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
2nd part of U/G 2/12/2004 9:34:47 AM
|
Electrical Rough-In | 1/27/2004 | 1/27/2004 | 1/27/2004 | A | PART |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 1/27/2004 at 7:09:21 AM. Contact: ###-####. 1/27/2004 7:38:25 AM
trench ok 1/27/2004 10:11:37 AM
|
Application received | | | 12/19/2003 | | |
|
|
|
|
Issue permit | | | 12/19/2003 | | DONE |
|
|
|
|