Final | 5/3/2004 | 5/4/2004 | 5/4/2004 | P | PASS |
Mike Kinnear
|
|
|
The shed wiring is ready for Final insp. Customer will leave the shed door unlocked if they have to leave. Thanks!!! Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok final 5/4/2004 2:04:32 PM
|
DOC - Permit Finaled | 5/4/2004 | 5/4/2004 | 5/4/2004 | P | PASS |
Mike Kinnear
|
|
|
Finaled by inspector at 5/4/2004 2:04:34 PM
|
Electrical Rough-In | 4/14/2004 | 4/15/2004 | 4/15/2004 | A | PASS |
Mike Kinnear
|
|
|
We installed a new exterior subpanel on the house and fed it from the existing exterior subpanel. We then ran a 40 amp 120/240 volt 4 wire circuit from the existing subpanel, underground in IMC 8" deep, to the new STOR-MOR shed, set a panel inside the shed and grounded it. We wired 3 lighting boxes, 1 paddle fan/light combo box, wired for 5 switches, 14 recepts., 1 exterior recept., 1 240volt recept. Customer should be home, but shed door will remain unlocked for your access if they have to leave.(leave it unlocked when you leave). THANKS !!! ; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok cover ri 4/15/2004 9:26:20 AM
|
Application received | | | 4/14/2004 | | |
|
|
|
|
Issue permit | | | 4/14/2004 | | |
|
|
|
|