Third Notice ELE | 4/21/2005 | 4/21/2005 | 4/22/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice ELE | 4/11/2005 | 4/11/2005 | 4/21/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice Sent | | 3/30/2005 | 4/11/2005 | | DONE |
|
|
|
|
DOC - Permit Finaled | 3/30/2005 | 3/30/2005 | 3/30/2005 | A | PASS |
Jack Frank
|
|
|
Finaled by inspector at 3/30/2005 7:54:33 AM
|
ELE-Aging Inspection | 3/30/2005 | 3/30/2005 | 3/30/2005 | | PASS |
Jack Frank
|
|
|
ok corrections made 3/30/2005 7:54:12 AM
|
(F) Reprint permit | | | 9/15/2004 | | DONE |
|
|
|
|
Final | 8/26/2004 | 8/27/2004 | 8/27/2004 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/26/2004 at 1:17:21 PM. Contact: ###-####. shall not use white # 12 as phase conductor called 8/27/2004 9:17:31 AM
|
Electrical Rough-In | 8/26/2004 | 8/26/2004 | 8/26/2004 | P | DONE |
Jack Frank
|
|
|
called contractor he was supposed to call for final inspection for corrections he did not reinspection fee due conference
|
ELE-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | FAIL |
Jack Frank
|
|
|
needs to grd light poles 410.15 called 8/9/2004 1:15:32 PM
|
Electrical Rough-In | 5/17/2004 | 5/18/2004 | 5/18/2004 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/17/2004 at 10:40:19 AM. Contact: ###-####. pole bases ok 5/18/2004 8:11:46 AM
|
Electrical Rough-In | 4/23/2004 | 4/26/2004 | 4/26/2004 | A | PART |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 4/23/2004 at 12:56:02 PM. Contact: ###-####.
burial depth ok, ok to cover conduit 4/26/2004 9:16:48 AM
|
Electrical Rough-In | 4/23/2004 | 4/23/2004 | 4/23/2004 | P | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/23/2004 at 11:14:23 AM. Contact: ###-####. called r/i not ready they just started working on project 4/23/2004 12:45:29 PM
|
(F) Reprint permit | | | 4/23/2004 | | DONE |
|
|
|
|
Application received | | | 4/22/2004 | | |
|
|
|
|
Issue permit | | | 4/22/2004 | | DONE |
|
|
|
|