Final | 7/29/2004 | 7/30/2004 | 7/30/2004 | P | PASS |
Pat Lass
|
|
|
We are now done with the service change-over, and ready for final insp. Thanks!!! Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
DOC - Permit Finaled | 7/30/2004 | 7/30/2004 | 7/30/2004 | P | PASS |
Pat Lass
|
|
|
Finaled by inspector at 7/30/2004 2:57:35 PM
|
Rough-In Permanent Service | 7/7/2004 | 7/8/2004 | 7/8/2004 | A | PASS |
Pat Lass
|
|
|
We installed a new 200 amp underground feed service on the back basement patio, and grounded it.We ran a new 2 inch pipe with feeder wires into the existing basement subpanel from this new service. Idaho Power will disconnect the existing overhead service and energize the new underground service in the near future, at which time we will remove the existing old service and connect our new feeder wires into the existing basement subpanel and call you back for a final inspection. Thanks!!! Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
P/S U/G R Ok 7/8/2004 10:43:51 AM
|
Application received | | | 6/22/2004 | | |
|
|
|
|
Issue permit | | | 6/22/2004 | | DONE |
|
|
|
|