Final | 9/28/2004 | 9/29/2004 | 9/29/2004 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/28/2004 at 4:31:30 PM. Contact: ###-####. ok 9/29/2004 10:21:17 AM
|
DOC - Permit Finaled | 9/29/2004 | 9/29/2004 | 9/29/2004 | A | PASS |
Jack Frank
|
|
|
Finaled by inspector at 9/29/2004 10:21:22 AM
|
Rough-In Permanent Service | 7/20/2004 | 7/21/2004 | 7/21/2004 | A | FAIL |
Jack Frank
|
|
|
###-#### see added p/s, cor. posted called left message 404.4 move switch boxes from tub space, 300.4 nail plates 7/21/2004 9:29:50 AM
|
Permanent Service | 7/21/2004 | 7/21/2004 | 7/21/2004 | A | PASS |
Jack Frank
|
|
|
p/s u/g new ok
|
Electrical Rough-In | 7/21/2004 | 7/21/2004 | 7/21/2004 | A | PASS |
Jack Frank
|
|
|
r/i ok survey posted
|
Issue & PRINT permit | | | 7/20/2004 | | DONE |
|
|
|
|
Application received | | | 7/20/2004 | | |
|
|
|
|