Temporary Service | 9/17/2004 | 9/17/2004 | 9/17/2004 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/17/2004 at 7:21:27 AM. Contact: ###-####.
T/S O/H Ok 9/17/2004 9:26:05 AM
|
DOC - Permit Finaled | 9/17/2004 | 9/17/2004 | 9/17/2004 | A | PASS |
Pat Lass
|
|
|
Finaled by inspector at 9/17/2004 9:26:06 AM
|
Temporary Service | 9/15/2004 | 9/15/2004 | 9/15/2004 | P | FAIL |
Pat Lass
|
|
|
###-#### jim
250.92 Services.
(A) Bonding of Services. The non-current-carrying metal parts of equipment indicated in 250.92(A)(1), (2), and (3) shall be effectively bonded together.
110.12 Mechanical Execution of Work.
(C) Integrity of Electrical Equipment and Connections. Internal parts of electrical equipment, including busbars, wiring terminals, insulators, and other surfaces, shall not be damaged or contaminated.
230.71 Maximum Number of Disconnects.
(A) General. The service disconnecting means for each service permitted by 230.2, or for each set of service-entrance conductors permitted by 230.40, Exception Nos. 1, 3, 4, or 5, shall consist of not more than six switches or sets of circuit breakers,
225.22 Raceways on Exterior Surfaces of Buildings or Other Structures.
Raceways on exterior surfaces of buildings or other structures shall be raintight and arranged to drain.
9/15/2004 2:03:56 PM
|
Issue permit | | | 9/15/2004 | | DONE |
|
|
|
|
Application received | | | 9/15/2004 | | |
|
|
|
|