Information based on query as of Saturday, July 20, 2024.
Permit Information
Permit NumberELE04-03064
StatusFinaled
Name PEAK ELECTRIC
Site Address 107 N CASTELLO PL
Project Name 
Customer NumberMARSOLER POOL
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final10/25/200410/26/200410/26/2004APASS
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 10/25/2004 at 1:32:25 PM. Contact: ###-####.
DOC - Permit Finaled10/26/200410/26/200410/26/2004APASS
DetailsWilliam E Thomas
Finaled by inspector at 10/26/2004 10:05:34 AM
Final10/15/200410/15/200410/15/2004PFAIL
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 10/15/2004 at 8:01:31 AM. Contact: ###-####.
680.23F3-no gfci protected conductors to occupy conduit space with non gfci protected conductors
680.12-disconnect for all utilization equipment to be installed within sight of equipment
680.26-pool equipment bonding conductor shall not be connected to equipment grounding conductors
680.26B3-all metal components shall be bonded
* the water level needs to be lowered so that the potting compound can be inspected. 10/15/2004 4:21:19 PM 10/15/2004 4:21:33 PM
Electrical Rough-In10/6/200410/6/200410/6/2004PPASS
DetailsPat Lass
###-#### - todd Note: Pool Bonding
Application received  10/5/2004  
Issue & PRINT permit  10/5/2004 DONE