Third Notice ELE | 1/28/2005 | 1/28/2005 | 3/17/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice ELE | 1/14/2005 | 1/14/2005 | 1/28/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice Sent | | 11/15/2004 | 1/14/2005 | | DONE |
|
|
|
|
DOC - Permit Finaled | 11/15/2004 | 11/15/2004 | 11/15/2004 | A | PASS |
Pat Lass
|
|
|
Finaled by inspector at 11/15/2004 9:48:31 AM
|
Rough-In Permanent Service | 11/12/2004 | 11/15/2004 | 11/15/2004 | A | PASS |
Pat Lass
|
|
|
We installed stepped lugs on the load side of the 400 amp 3 phase service disconnect, then fed a new 60 amp 3 phase raintight disconnect to the right. Ran a 40 amp ckt. in a 3/4" EMT from this disconnect down the wall to feed a new weather proof receptacle for their hyster charger.THANKS!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
Application received | | | 11/12/2004 | | |
|
|
|
|
Issue permit | | | 11/12/2004 | | DONE |
|
|
|
|