First Notice Sent | | 4/7/2005 | 4/13/2005 | | DONE |
|
|
|
|
DOC - Permit Finaled | 4/7/2005 | 4/7/2005 | 4/7/2005 | P | PASS |
Jack Frank
|
|
|
Finaled by inspector at 4/7/2005 4:04:30 PM
|
Final | 4/7/2005 | 4/7/2005 | 4/7/2005 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/7/2005 at 7:30:16 AM. Contact: ###-####. ok card signed 4/7/2005 4:04:26 PM
|
Electrical Rough-In | 2/25/2005 | 2/28/2005 | 2/28/2005 | A | PASS |
Jack Frank
|
|
|
zane ###-#### 1st floor center section 2/28/2005 8:19:22 AM
|
Electrical Rough-In | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | PASS |
Jack Frank
|
|
|
r/i 1st floor center section 2/25/2005 2:30:41 PM
|
Final | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/25/2005 at 8:32:58 AM. Contact: ###-####.///per zane///2/25/05 BAS
|
Electrical Rough-In | 2/17/2005 | 2/17/2005 | 2/17/2005 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/17/2005 at 8:13:57 AM. Contact: ###-####. 2nd floor walls and hard ceilings ok 2/17/2005 2:42:15 PM
|
Rough-In Permanent Service | 2/8/2005 | 2/9/2005 | 2/9/2005 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/8/2005 at 8:02:52 PM. Contact: ###-####. u/g ok p/s u/g new ok 2/9/2005 8:24:10 AM
|
Rough-In Permanent Service | 2/8/2005 | 2/8/2005 | 2/8/2005 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/8/2005 at 9:07:31 AM. Contact: ###-####. stop work posted u/g parking lot done by excavation contractor called electrical contractor,also talked to his man on site and talked with general at job site 2/8/2005 2:11:18 PM
|
Electrical Rough-In | 2/3/2005 | 2/3/2005 | 2/3/2005 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/3/2005 at 7:32:09 AM. Contact: ###-####. north section of building walls and hard ceilings ok 2/3/2005 4:02:24 PM
|
Rough-In Permanent Service | 2/1/2005 | 2/2/2005 | 2/2/2005 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/1/2005 at 10:25:19 AM. Contact: ###-####. cor. and do not cover posted met contractor,310.15(B)(2)(a) derate conductorsin ENT,110.3(A) replace damaged MC, 250.24 terminate GRC at neutral bus not equip grd bus,362.26 shall not be more than 360 degrees of bends ENT250.70 shall use grd clamp listed for size GEC 620.23(A) shall provide seperate circuit for elevator machine rm lights and recepts soffit only ok for cover reinspection fee due posted 2/2/2005 2:51:29 PM
|
Permanent Service | 1/28/2005 | 1/28/2005 | 1/28/2005 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/28/2005 at 11:09:06 AM. Contact: ###-####. corrections not made same cor. posted called also reinspection fee due posted 1/28/2005 4:02:37 PM
|
Permanent Service | 1/27/2005 | 1/27/2005 | 1/27/2005 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/27/2005 at 9:21:10 AM. Contact: ###-####. cor. posted needs bond strap, grd water system 1/27/2005 3:55:09 PM
|
Electrical Rough-In | 1/10/2005 | 1/10/2005 | 1/10/2005 | P | PART |
Jack Frank
|
|
|
zane ###-#### r/i ok east section ok buildind walls and ceiling 1/10/2005 3:21:07 PM
|
Issue permit | | | 1/10/2005 | | DONE |
|
|
|
|
Application received | | | 1/7/2005 | | |
|
|
|
|