Second Notice ELE | 4/26/2006 | 4/26/2006 | 4/27/2006 | | DONE |
|
|
|
This permit finaled on the web by Kevin Braithwait
|
First Notice | 3/28/2006 | 3/28/2006 | 4/26/2006 | | DONE |
Pat Lass
|
|
|
|
Permanent Service | 3/27/2006 | 3/28/2006 | 3/28/2006 | A | PASS |
Pat Lass
|
|
|
Will be on-site by 7:30am. ; Phone #: ###-#### Internet Inspection Request from: Kevin Braithwait P/S U/G R Ok
|
DOC - Permit Finaled | 3/28/2006 | 3/28/2006 | 3/28/2006 | P | PASS |
Pat Lass
|
|
|
Will be on-site by 7:30am. ; Phone #: ###-#### Internet Inspection Request from: Kevin Braithwait
|
ELE-Aging Inspection | 3/8/2006 | 3/8/2006 | 3/9/2006 | | NR |
Pat Lass
|
|
|
suc
|
ELE-Aging Inspection | 1/5/2006 | 1/5/2006 | 1/6/2006 | | NR |
Pat Lass
|
|
|
approved by Jim for 2 services by special permission
|
Permanent Service | 10/25/2005 | 10/25/2005 | 10/25/2005 | P | NR |
Pat Lass
|
|
|
kevin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles had conf. this has to be classified as 2 buildings or have only one service. we will also get a calculation.
|
Permanent Service | 10/20/2005 | 10/20/2005 | 10/20/2005 | P | FAIL |
Jack Frank
|
|
|
kevin ###-#### 110.26 clearence for p/s, needs all grounding and bonding done, 230.6 service entrance conductors not allowed in building needs main outside and all gear in will be sub panels, is bldg #9 one or two buildings if one only one p/s allowed
|
ELE-Aging Inspection | 10/6/2005 | 10/6/2005 | 10/7/2005 | | NR |
Pat Lass
|
|
|
|
(F) Reprint permit | | | 8/26/2005 | | DONE |
|
|
|
|
ELE-Aging Inspection | 8/4/2005 | 8/4/2005 | 8/4/2005 | | NR |
Pat Lass
|
|
|
suc
|
Permanent Service | 2/8/2005 | 2/9/2005 | 2/9/2005 | A | FAIL |
Pat Lass
|
|
|
###-####
only 1 service lateral per building.
isolate neutrals. 2/9/2005 10:00:01 AM
|
Application received | | | 2/8/2005 | | |
|
|
|
|
Issue permit | | | 2/8/2005 | | DONE |
|
|
|
|