Temporary Service | 2/24/2005 | 2/25/2005 | 2/25/2005 | A | NR |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/24/2005 at 4:24:31 PM. Contact: ###-####. recpt missing, cover off, called contr and said not ready and to call when ready. Talked to recorder and left message 2/25/2005 7:49:14 AM
|
Temporary Service | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/25/2005 at 8:04:22 AM. Contact: ###-####. corrections made t/s u/g n ok 2/25/2005 1:45:09 PM
|
DOC - Permit Finaled | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | PASS |
Bob Reichert
|
|
|
Finaled by inspector at 2/25/2005 1:45:11 PM
|
Temporary Service | 2/23/2005 | 2/24/2005 | 2/24/2005 | A | FAIL |
Bob Reichert
|
|
|
steve ###-#### 110.12(C) There shall be no broken parts, nor any contamination in meter(dirt), 250.24(4) grounding electrode conductor shall connect to grounded conductor bar, 250.24 grounding electrode shall be connected. called left message,and card 2/24/2005 8:10:28 AM
|
Application received | | | 2/23/2005 | | |
|
|
|
|
Issue & PRINT permit | | | 2/23/2005 | | |
|
|
|
|