Final | 5/24/2005 | 5/25/2005 | 5/25/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/24/2005 at 3:00:00 PM. Contact: ###-####. ok to final
|
Rough-In Permanent Service | 4/7/2005 | 4/8/2005 | 4/8/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 4/7/2005 at 12:45:43 PM. Contact: ###-####. corrections made, ric ok, p/s u/g n ok 4/8/2005 9:58:31 AM
|
Rough-In Permanent Service | 4/5/2005 | 4/7/2005 | 4/7/2005 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/5/2005 at 5:07:44 PM. Contact: ###-####. cor. posted called left massage 300.4 nail plates and 11/4", 334.23 protect cables by attic access, 110.3,11.14(A) use appoved tool and splices shall be tight grd crimp slleeves, 210.52(C) outlet end of peninsulsr counter shall face counter side 4/7/2005 9:06:28 AM
|
Issue & PRINT permit | | | 3/28/2005 | | |
|
|
|
|
Application received | | | 3/28/2005 | | |
|
|
|
|