First Notice | | 6/14/2005 | 7/13/2005 | | DONE |
|
|
|
|
ELE-Aging Inspection | 6/14/2005 | 6/14/2005 | 6/14/2005 | | PASS |
Jack Frank
|
|
|
final added
|
Final | 6/14/2005 | 6/14/2005 | 6/14/2005 | P | PASS |
Jack Frank
|
|
|
ok
|
Final | 4/1/2005 | 4/1/2005 | 4/1/2005 | A | NR |
Jack Frank
|
|
|
called 4/1/2005 8:47:05 AM
|
Electrical Rough-In | 3/29/2005 | 3/30/2005 | 3/30/2005 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/29/2005 at 3:14:57 PM. Contact: ###-####. u/g ok corrections made 3/30/2005 7:35:29 AM
|
Electrical Rough-In | 3/28/2005 | 3/29/2005 | 3/29/2005 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/28/2005 at 2:27:16 PM. Contact: ###-####. needs 24 inches below parking lot for u/g called 3/29/2005 12:11:15 PM
|
Electrical Rough-In | 3/29/2005 | 3/29/2005 | 3/29/2005 | A | PART |
Jack Frank
|
|
|
conference ok only they will open up 3 locations for trench inspection
|
Application received | | | 3/28/2005 | | |
|
|
|
|
Issue permit | | | 3/28/2005 | | DONE |
|
|
|
|