First Notice | | 7/7/2005 | 7/7/2005 | | DONE |
|
|
|
|
Final | 6/1/2005 | 6/2/2005 | 6/2/2005 | A | PASS |
William E Thomas
|
|
|
Ready for reinspection please. Thanks; Phone #: ###-#### Internet Inspection Request from: Barry Kendall
|
Final | 5/31/2005 | 5/31/2005 | 5/31/2005 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/31/2005 at 8:48:04 AM. Contact: ###-####. called same corrections plus shall not use white as phase, in conduit, and ID white used as phase in cable
|
Final | 5/26/2005 | 5/27/2005 | 5/27/2005 | A | FAIL |
Jack Frank
|
|
|
REINSPECTION FOR XEROX, PLEASE; Phone #: ###-#### Internet Inspection Request from: Barry Kendall cor. and fee due posted called, corrections not made and new ones created 310.15 derate conductors from panel to jbox, 300.3(B) all conductors of cir
|
Final | 5/25/2005 | 5/26/2005 | 5/26/2005 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/25/2005 at 4:23:55 PM. Contact: ###-####. cor. posted called 250.30 (A)(7) FPN and 250.104(D) bond all water systems, 310.15 derate conductors in conduit from panel to jbox and install covers, where is dis
|
Electrical Rough-In | 5/5/2005 | 5/6/2005 | 5/6/2005 | A | PASS |
Pat Lass
|
|
|
###-#### CEILING INSPECTION ONLY PLEASE; Phone #: ###-#### Internet Inspection Request from: Barry Kendall 5/6/2005 7:39:59 AM
|
Electrical Rough-In | 4/22/2005 | 4/25/2005 | 4/25/2005 | P | PASS |
Mike Kinnear
|
|
|
WALL COVER INSPECTION PLEASE; Phone #: ###-#### Internet Inspection Request from: Barry Kendall ok cover walls only
|
Application received | | | 4/22/2005 | | |
|
|
|
|
Issue permit | | | 4/22/2005 | | DONE |
|
|
|
|