Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberELE05-01399
StatusFinaled
Name MOUNTAIN POWER ELECT CONTR
Site Address 6328 W STATE ST
Project NameIDAHO CENTRAL CREDIT UNION
Customer Number 
ePlanReview 
Description
complete wiring of 5,740 sq. ft. building per initial cert of value $80,889///4/25/05 LEM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice ELE10/26/200510/26/200511/4/2005 DONE
Second Notice has not been responded to.
Second Notice ELE10/12/200510/12/200510/26/2005 DONE
First Notice has not been responded to.
First Notice9/28/20059/28/200510/12/2005 DONE
DetailsBob Reichert
Final9/28/20059/29/20059/28/2005APASS
DetailsBob Reichert
Bob called and said to request final again for this afternoon. Please call to let me know this request is received. Steve w/ Mountain Power ###-####. Thank you!; Phone #: ###-#### Internet Inspection Request from: Steve Syltie met with contr, signed occ card, told to re-label recpts and cover one ko. ok to final
Final9/20/20059/20/20059/20/2005PFAIL
DetailsBob Reichert
please call at least a half hour prior to inspection////jim or steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore called contr, left message, received installation instructions from contr at job, the furniture is designed as 3 ckt, but has been fed with a single ckt and the three recpts operate from the single ckt. Re-wiring the unit might void the labelling, so I told the contr via message that a third party evaluation was required.
Final9/16/20059/19/20059/19/2005APART
DetailsBob Reichert
request for 8:30am//please call prior//jim dorsey; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa checked fixtures and labels along with letter from mfgr. Still need furniture label. Fixtures ok.
Final9/14/20059/15/20059/15/2005APART
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 9/14/2005 at 6:10:46 PM. Contact: ###-####.
only two items still needed-
1. ul info on pendant fixtures in lobby and entry
2. ul info on the office cubicle system as an assembly.
Electrical Rough-In8/18/20058/19/20058/19/2005PPASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 8/18/2005 at 3:20:33 PM. Contact: ###-####. ok to cover ceiling, tails for office furniture ok 3 places
Permanent Service7/18/20057/19/20057/19/2005PPASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 7/18/2005 at 2:12:40 PM. Contact: ###-####. p/s u/g n ok
Electrical Rough-In7/11/20057/11/20057/11/2005PPASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 7/11/2005 at 8:39:56 AM. Contact: ###-####. vault and soffit lights ok to cover
Electrical Rough-In6/28/20056/29/20056/29/2005APASS
DetailsPat Lass
for south half walls only please////skip; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
this finishes the walls
Electrical Rough-In6/24/20056/24/20056/24/2005PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 6/24/2005 at 7:40:42 AM. Contact: ###-####. bathroom lids and walls ok, north 1/2 building walls only ok to cover
Electrical Rough-In6/23/20056/23/20056/23/2005PPART
DetailsBob Reichert
skip; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to cover canopy
Electrical Rough-In6/21/20056/21/20056/21/2005PPART
DetailsBob Reichert
skip; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to partially cover soffits, need to look at fixtures before cover
Electrical Rough-In5/26/20055/26/20055/26/2005PPASS
DetailsBob Reichert
underground insp for parking lot skip ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover u/g for parking lot
Electrical Rough-In5/12/20055/13/20055/13/2005APASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 5/12/2005 at 1:43:38 PM. Contact: ###-####. u/g north side of bldg and bldg slab ok to cover
Permanent Service5/10/20055/11/20055/11/2005PPASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 5/10/2005 at 7:45:48 AM. Contact: ###-####. ok to cover north side bldg for phones, parking lot lights. Contr will offset 1 pipe to stay under 360 degree bend
Permanent Service5/5/20055/6/20055/6/2005AFAIL
DetailsBob Reichert
underground inspection//skip; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa called contr, left corr notice, 352.24 bends shall be made with proper bending equip and no kinks 5/6/2005 8:15:09 AM
Electrical Rough-In4/27/20054/28/20054/28/2005APASS
DetailsBob Reichert
upher ground inpsection please///skip; Phone #: ###-#### Internet Inspection Request from: Barbara Moore gec ok to pour 4/28/2005 8:59:25 AM
Application received  4/25/2005  
Issue permit  4/25/2005 DONE