Electrical Permit - New: MISCELLANEOUS ELECTRICAL WIRING INCLUDING NEW LIGHTING AND SWITCHGEAR FOR THE NEW BANNER BANK BUILDING
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice ELE6/7/20066/7/20066/12/2006 DONE
This permit finaled on the web by Jeff Radford
First Notice5/22/20065/22/20066/7/2006 DONE
DetailsPat Lass
Final5/19/20065/22/20065/22/2006APASS
DetailsPat Lass
erin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
finaled shell and core.
Electrical Rough-In5/18/20065/18/20065/18/2006PPART
DetailsPat Lass
floors on 8 and 11 R/I ok
Electrical Rough-In5/15/20065/16/20065/16/2006PPASS
DetailsPat Lass
Scheduled by a contractor via Hello! on 5/15/2006 at 2:23:10 PM. Contact: ###-####.
9th and 10th floor floor R/I ok to cover.
anop
Final4/10/20064/10/20064/10/2006PPART
DetailsWilliam E Thomas
###-#### - joel
main building complete for core/shell except for the drive thru lane for bank.
Final3/31/20063/31/20063/31/2006PPART
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 3/31/2006 at 9:21:33 AM. Contact: ###-####.
accent lighting on floors 1,3,5,7,11 still need to be installed to complete the core and shell.
Electrical Rough-In3/30/20063/31/20063/31/2006APASS
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 3/30/2006 at 2:53:10 PM. Contact: ###-####.
as noted per the prints
Electrical Rough-In3/29/20063/29/20063/29/2006PPASS
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 3/29/2006 at 9:57:44 AM. Contact: ###-####.
ri ok per plan notations
Electrical Rough-In3/21/20063/21/20063/21/2006PPART
DetailsPat Lass
Scheduled by a contractor via Hello! on 3/21/2006 at 7:24:29 AM. Contact: ###-####.
bathrooms on 3 floors and site work on 10th st side
Electrical Rough-In3/16/20063/17/20063/17/2006APART
DetailsPat Lass
Scheduled by a contractor via Hello! on 3/16/2006 at 1:16:12 PM. Contact: ###-####.
anop
Electrical Rough-In3/14/20063/14/20063/14/2006APART
DetailsPat Lass
Scheduled by a contractor via Hello! on 3/14/2006 at 7:19:02 AM. Contact: ###-####.
1st floor ceiling ANOP
Electrical Rough-In3/13/20063/13/20063/13/2006PPART
DetailsPat Lass
Scheduled by a contractor via Hello! on 3/13/2006 at 10:55:29 AM. Contact: ###-####.
outside site lighting on Bannock st side ANOP ok
Electrical Rough-In3/8/20063/9/20063/9/2006PPART
DetailsPat Lass
Scheduled by a contractor via Hello! on 3/8/2006 at 1:30:00 PM. Contact: ###-####.
anop
Electrical Rough-In3/6/20063/6/20063/6/2006PPASS
DetailsMike Kinnear
joel ###-#### ok cover ceiling (when lights are installed we need to reinspect.) ok cover floor.
Electrical Rough-In3/2/20063/2/20063/2/2006PPART
DetailsPat Lass
Scheduled by a contractor via Hello! on 3/2/2006 at 7:57:44 AM. Contact: ###-####.
2nd and 3rd floor ceilings anop
Electrical Rough-In2/27/20062/28/20062/28/2006AFAIL
DetailsPat Lass
Scheduled by a contractor via Hello! on 2/27/2006 at 9:52:44 AM. Contact: ###-####.
terminal boxes not listed as an assembly and wiring method is not identified on the assembly, so I left a correction for listing and 604.6 marking and 348.26 360 degree of bend.
Electrical Rough-In2/17/20062/17/20062/17/2006PPASS
DetailsWilliam E Thomas
joel; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
floor cover as noted on prints ok to cover.
Override - Parcel Holds1/1/19001/1/19002/17/2006  
Electrical Rough-In2/7/20062/8/20062/8/2006APART
DetailsPat Lass
Scheduled by a contractor via Hello! on 2/7/2006 at 1:52:08 PM. Contact: ###-####.
the remaining elevator lobby nwalls ok
Electrical Rough-In2/3/20062/3/20062/3/2006PPART
DetailsPat Lass
Scheduled by a contractor via Hello! on 2/3/2006 at 9:07:51 AM. Contact: ###-####.
2 through 8 elevator lobby walls ok
Electrical Rough-In1/30/20061/30/20061/30/2006PPART
DetailsPat Lass
Scheduled by a contractor via Hello! on 1/30/2006 at 9:53:57 AM. Contact: ###-####.
3rd and 6th floor elevator lobbies.
anop walls ok
Electrical Rough-In1/27/20061/27/20061/27/2006PPART
DetailsPat Lass
###-####. Scheduled by a contractor via Hello! on 1/27/2006 at 7:49:22 AM. Contact: ###-####.
2nd floor elevator lobby wall ANOP
Electrical Rough-In1/9/20061/10/20061/10/2006APART
DetailsPat Lass
###-####. Scheduled by a contractor via Hello! on 1/9/2006 at 8:57:40 AM. Contact: ###-####.
R/I Ok for 4 shower rooms on 1st floor and smoker room on 2nd floor anop
ok to shut down on fri. to change out luggs on service.
Electrical Rough-In1/4/20061/4/20061/4/2006APART
DetailsPat Lass
Scheduled by a contractor via Hello! on 1/4/2006 at 7:08:56 AM. Contact: ###-####.
2nd floor conf room ceiling and electrical rooms through 11th floor
ANOP
Electrical Rough-In12/19/200512/19/200512/19/2005PPART
DetailsPat Lass
Scheduled by a contractor via Hello! on 12/19/2005 at 7:58:03 AM. Contact: ###-####.
Penthouse covered walls ok ANOP
discussed listing and clearance requirements on HVACunit
Permanent Service12/19/200512/19/200512/19/2005PPASS
DetailsPat Lass
Scheduled by a contractor via Hello! on 12/19/2005 at 7:58:03 AM. Contact: ###-####.
P/S U/G R OK
Electrical Rough-In11/30/200512/1/200512/1/2005APART
DetailsPat Lass
Scheduled by a contractor via Hello! on 11/30/2005 at 1:34:37 PM. Contact: ###-####.
anop
Electrical Rough-In10/31/200510/31/200510/31/2005PPART
DetailsPat Lass
Scheduled by a contractor via Hello! on 10/31/2005 at 7:42:06 AM. Contact: ###-####.
anop
Electrical Rough-In10/12/200510/13/200510/13/2005PPART
DetailsPat Lass
joel; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
anop
Electrical Rough-In10/5/200510/6/200510/6/2005PPART
DetailsPat Lass
Scheduled by a contractor via Hello! on 10/5/2005 at 1:20:25 PM. Contact: ###-####.
anop
Electrical Rough-In9/26/20059/27/20059/27/2005PPART
DetailsPat Lass
wall inspection//joel; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
anop
Temporary Service9/10/20059/12/20059/12/2005ACANC
DetailsBob Reichert
Scheduled by a contractor via Hello! on 9/10/2005 at 11:30:18 AM. Contact: ###-####. see ri
Electrical Rough-In9/12/20059/12/20059/12/2005APASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 9/10/2005 at 11:30:18 AM. Contact: ###-####. talked w/ contr, looked at u/g for construction elevator, partial gndg for switchgear, they are just starting to pull some wiring, looked at temp power dist center that they can hoist up as floor gets poured. Talked about a print to mark as inspections are done.
ELE-Aging Inspection9/7/20059/7/20059/9/2005 NR
DetailsPat Lass
suc
Electrical Rough-In6/22/20056/23/20056/23/2005PPART
DetailsWilliam E Thomas
THIS IS FOR A UNDERGROUND INSPECTION, ANY QUESTIONS PLEASE GIVE JOEL SMITH A CALL; Phone #: ###-#### Internet Inspection Request from: Jeff Radford
underground for the electric room ok, telephone conduits ok
Electrical Rough-In6/16/20056/16/20056/16/2005PPART
DetailsJim Schmer
Scheduled by a contractor via Hello! on 6/16/2005 at 9:10:45 AM. Contact: ###-####. partial service conduits for underground. ok jms
Electrical Rough-In6/3/20056/6/20056/6/2005PPART
DetailsPat Lass
THIS IS FOR A CRANE INSPECTION. ANY QUESTIONS PLEASE CALL JOEL SMITH.; Phone #: ###-#### Internet Inspection Request from: Jeff Radford
Electrical Rough-In6/3/20056/3/20056/3/2005PCANC
DetailsPat Lass
THIS IS FOR A CRANE INSPECTION. ANY QUESTIONS PLEASE CALL JOEL SMITH; Phone #: ###-#### Internet Inspection Request from: Jeff Radford
canceled by contractor
Electrical Rough-In5/20/20055/20/20055/20/2005PPART
DetailsPat Lass
any questions please call Joel Smith; Phone #: ###-#### Internet Inspection Request from: Jeff Radford
U/G to crane ok
Owner Supplied Equipment  5/10/2005  
Application received  5/10/2005 DONE
This permit was created on the web by Jeff Radford
Electrical Rough-In5/10/20055/10/20055/10/2005PPART
DetailsPat Lass
THIS IS FOR A UFER UNDERGROUND INSPECTION ANY QUESTIONS PLEASE CALL JOEL SMITH; Phone #: ###-#### Internet Inspection Request from: Jeff Radford
electrode ok 5/10/2005 3:46:48 PM