Final | 7/5/2005 | 7/5/2005 | 7/5/2005 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/5/2005 at 9:09:24 AM. Contact: ###-####. still need to do pool part. bldg ok to final
|
Permanent Service | 6/22/2005 | 6/23/2005 | 6/23/2005 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/22/2005 at 3:59:39 PM. Contact: ###-####. p/s u/g new ok
|
Rough-In Permanent Service | 6/22/2005 | 6/22/2005 | 6/22/2005 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/22/2005 at 10:01:40 AM. Contact: ###-####. r/i ok cor. posted for p/s called left message, 250.92(A)(3) remove branch circuit from raceway for GEC and bond both ends
|
Rough-In Permanent Service | 6/20/2005 | 6/20/2005 | 6/20/2005 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/20/2005 at 8:13:20 AM. Contact: ###-####. cor posted called needs concrete encased electrode, 210.70 install required fixtures all exits exterior side, 410.30 (C)(1) 1&2, cord shall be cord cap and recept, 250.12 clean paint where grd or bond to metal
|
Application received | | | 6/15/2005 | | |
|
|
|
|
Issue permit | | | 6/15/2005 | | DONE |
|
|
|
|