Final | 3/16/2006 | 3/17/2006 | 3/17/2006 | P | PASS |
Bob Reichert
|
|
|
NEED FINAL ON HOT TUB. WILL LEAVE NORTH GATE OPEN, PLEASE MAKE SURE ITS CLOSED AFTER. THANK YOU.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH ok to final
|
Final | 8/11/2005 | 8/12/2005 | 8/12/2005 | A | NR |
Bob Reichert
|
|
|
FINAL FOR HOT TUB; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH hot tub still needs 3rd party evaluation or replaced. called contr.
|
Final | 8/9/2005 | 8/10/2005 | 8/10/2005 | P | FAIL |
Jack Frank
|
|
|
final inspect for branch panel & hot tub circuit; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH cor. posted called hot tub wired to canadian standards shall replace or have it tested by testing lab for US standards, 680.26(C) use min. #8 solid for bonding, 680.22(A)(3) outlet shall be no closer than 10FT no further than 20ft
|
Final | 8/8/2005 | 8/9/2005 | 8/9/2005 | P | NR |
Bob Reichert
|
|
|
WIRING FOR BRANCH PANEL & HOT TUB CIRCUIT.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH met elect, talked about 90's, clearances, and not being ready for inspection
|
Application received | | | 6/22/2005 | | |
|
|
|
|
Issue permit | | | 6/22/2005 | | DONE |
|
|
|
|