Final | 9/14/2005 | 9/15/2005 | 9/15/2005 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/14/2005 at 4:00:30 PM. Contact: ###-####. u/g ok,
|
Final | 9/1/2005 | 9/2/2005 | 9/2/2005 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/1/2005 at 4:22:57 PM. Contact: ###-####. cor. posted called680.23(F) no UF cable allowed,680.26 complete all bonding,362.22 3/4" ent too much wire fill, 110.26(F)(2) clearence foe panel by pool equip, or make jbox out of it, 250.148 grd jbox, uncover all wiring covered before inspection, this is the 2nd time posting this violation
|
Electrical Rough-In | 8/25/2005 | 8/26/2005 | 8/26/2005 | A | FAIL |
Jack Frank
|
|
|
niche light inspection for pool///zane; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa not ready and cor. posted met contractor, u/g and equipotential grid covered before inspection
|
Electrical Rough-In | 7/5/2005 | 7/5/2005 | 7/5/2005 | P | PART |
Bob Reichert
|
|
|
bonding///zane; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa pool bond only ok, need to see equipotential plane and u/g
|
Application received | | | 7/5/2005 | | |
|
|
|
|
Issue permit | | | 7/5/2005 | | DONE |
|
|
|
|