Final | 9/9/2005 | 9/9/2005 | 9/9/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/9/2005 at 7:13:54 AM. Contact: ###-####. called contr about rev polarity on 1 rcpt and low volt wire below meter. ok to final
|
Electrical Rough-In | 7/15/2005 | 7/18/2005 | 7/18/2005 | A | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/15/2005 at 8:47:58 AM. Contact: ###-####. contr apparently called wrong permit #. This was already done last week. Verified with contr that no inspection for today required.
|
Electrical Rough-In | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | CANC |
Bob Reichert
|
|
|
###-#### - dino see rip
|
Rough-In Permanent Service | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | PASS |
Bob Reichert
|
|
|
###-#### - dino called contr to check entry outside light box for rigid mounting. ric ok p/s u/g n ok
|
Issue permit | | | 7/15/2005 | | DONE |
|
|
|
|
Application received | | | 7/15/2005 | | |
|
|
|
|