Second Notice ELE | 8/9/2005 | 8/9/2005 | 8/10/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 7/26/2005 | 7/26/2005 | 8/9/2005 | | DONE |
Pat Lass
|
|
|
|
Electrical Rough-In | 7/26/2005 | 7/26/2005 | 7/26/2005 | P | PASS |
Pat Lass
|
|
|
DSL Meter install for N. Collister for right of way. ; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH P/S U/G N Ok
|
DOC - Permit Finaled | 7/26/2005 | 7/26/2005 | 7/26/2005 | P | PASS |
Pat Lass
|
|
|
DSL Meter install for N. Collister for right of way. ; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH
|
Permanent Service | 7/25/2005 | 7/25/2005 | 7/25/2005 | P | CANC |
Pat Lass
|
|
|
WE WILL BE READY LATE IN THE DAY TODAY AND WOULD LIKE TO BE ABLE TO HAVE IDAHO POWER TURN THE POWER BACK ON. THEY WILL NOT RE-CONNECT UNTILL WE HAVE INSPECTION. PLEASE CALL THE ELECTRICIAN ON SITE PRIOR TO ARRIVAL SO HE CAN CONFIRM THAT HE WILL BE READY FOR THE INSPECTION. ANY QUESTIONS YOU CAN ALSO CALL BRIAN KEITH AT THE OFFICE. THANK YOU.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH contractor called and canceled
|
Electrical Rough-In | 7/22/2005 | 7/25/2005 | 7/25/2005 | A | NR |
Jack Frank
|
|
|
dor dls meter in north collister for right of way--brian ###-#### not ready called
|
Application received | | | 7/22/2005 | | |
|
|
|
|
Issue & PRINT permit | | | 7/22/2005 | | |
|
|
|
|