Final | 3/13/2007 | 3/14/2007 | 3/14/2007 | A | PASS |
Pat Lass
|
|
|
Steve; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
Final | 3/12/2007 | 3/13/2007 | 3/13/2007 | A | FAIL |
Bob Reichert
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles met owner, left corr notice, nec 210.8(A)(2) garage recpts shall be gfci, 210.8(A)(7) laundry recpt shall be gfci, 422.31(B) water heater shall have disconnect provisions, BCC floor recpt shall have steel cover, garage shall have minimum 3' clearance around walls for access to inspect
|
Electrical Rough-In | 6/6/2006 | 6/7/2006 | 6/7/2006 | A | PASS |
Pat Lass
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles R/I Ok
|
Final | 6/5/2006 | 6/5/2006 | 6/5/2006 | P | CANC |
William E Thomas
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles wrong insp type
|
Permanent Service | 6/5/2006 | 6/5/2006 | 6/5/2006 | P | PASS |
William E Thomas
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles p/s u/g n ok
|
Electrical Rough-In | 6/5/2006 | 6/5/2006 | 6/5/2006 | P | FAIL |
William E Thomas
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles B.C.C. requires that all makeup be done before roughin-inspection.
|
Conference | 7/28/2005 | 7/29/2005 | 7/29/2005 | P | PART |
Pat Lass
|
|
|
after 2 please////###-#### steve talked about service
|
Application received | | | 7/28/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/28/2005 | | DONE |
|
|
|
|