Final | 8/25/2005 | 8/29/2005 | 8/29/2005 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/25/2005 at 11:33:41 AM. Contact: ###-####. ok
|
Electrical Rough-In | 8/15/2005 | 8/15/2005 | 8/15/2005 | P | PART |
Jack Frank
|
|
|
deb-- ###-#### -re-insp --call 1st before insp cor posted needs to grd water system within 5 ft, bond hot and cold
|
Electrical Rough-In | 8/12/2005 | 8/15/2005 | 8/15/2005 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 8/12/2005 at 2:03:49 PM. Contact: ###-####. told owner needed 2nd gnd rod, color phase wires, bush se conductors, panel schedule
|
Permanent Service | 8/15/2005 | 8/15/2005 | 8/15/2005 | P | PASS |
Jack Frank
|
|
|
p/s o/h rec. ok jf
|
Application received | | | 8/12/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/12/2005 | | DONE |
|
|
|
|