Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberELE05-03180
StatusFinaled
Name COMMERCIAL ELECTRIC
Site Address 380 S 8TH ST
Project NameJOS A BANK CLOTHIERS BODO 7
Customer Number 
ePlanReview 
Description
Furnish & install lighting contractor, time clock, receptacles and switches, install light fixtures & heater per initial cert of value $24,200///8/31/05 BAS///Final cert of value - 29,676.00 11/17/2005 cmc
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice ELE11/10/200511/10/200511/17/2005 DONE
First Notice has not been responded to.
First Notice10/26/200510/26/200511/10/2005 DONE
DetailsBob Reichert
Final10/25/200510/26/200510/26/2005APASS
DetailsBob Reichert
Phone #: ###-#### Internet Inspection Request from: Dan Hardisty corr done, signed occ card, ok to final
Final10/21/200510/24/200510/24/2005APART
DetailsBob Reichert
Phone #: ###-#### Internet Inspection Request from: Dan left corr notice to finish drip shield 2 plcs, rest ok, signed t/o card
Final10/19/200510/21/200510/21/2005PCANC
DetailsBob Reichert
Phone #: ###-#### Internet Inspection Request from: Dan Hardisty Inspection cancelled from web by: Dan Hardisty
Electrical Rough-In10/11/200510/12/200510/12/2005PFAIL
DetailsBob Reichert
Scheduled by a contractor via Hello! on 10/11/2005 at 4:07:41 PM. talked with contr, gave ok to cover front half clg, left corr notice for back 1/2 clg. 110.26(F)(1)(b) protection shall be installed to avoid damage to elect equip in dedicated space. Also wrote corr notice to Bld05-00311- nec 800.24 Comm cables shall be installed in workmanlike manner and supported by straps,staples, hangers or similar fittings and installed so as to not damage the cable.
Conference10/5/200510/6/200510/6/2005ADONE
DetailsBob Reichert
Scheduled by a contractor via Hello! on 10/5/2005 at 1:08:59 PM. Contact: ###-####. talked about enclosures for steam press area
Electrical Rough-In9/30/200510/3/200510/3/2005APASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 9/30/2005 at 2:05:03 PM. ###-####. ok to cover bath walls and column in front area, hall area walls too.
Rough-In Permanent Service9/19/20059/20/20059/20/2005APASS
DetailsPat Lass
###-####. Scheduled by a contractor via Hello! on 9/19/2005 at 8:18:27 AM. Contact: ###-####.
P/S U/G N Ok
this is for 2 meters
Electrical Rough-In9/8/20059/9/20059/9/2005APART
DetailsPat Lass
Scheduled by a contractor via Hello! on 9/8/2005 at 2:27:51 PM. Contact: ###-####.
partial on walls aNd hardlids
Electrical Rough-In8/31/20058/31/20058/31/2005PPART
DetailsPat Lass
Scheduled by a contractor via Hello! on 8/31/2005 at 10:24:04 AM. Contact: ###-####.
u/g ok
Application received  8/31/2005  
Issue permit  8/31/2005 DONE