Second Notice ELE | 11/10/2005 | 11/10/2005 | 11/17/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 10/26/2005 | 10/26/2005 | 11/10/2005 | | DONE |
Bob Reichert
|
|
|
|
Final | 10/25/2005 | 10/26/2005 | 10/26/2005 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dan Hardisty corr done, signed occ card, ok to final
|
Final | 10/21/2005 | 10/24/2005 | 10/24/2005 | A | PART |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dan left corr notice to finish drip shield 2 plcs, rest ok, signed t/o card
|
Final | 10/19/2005 | 10/21/2005 | 10/21/2005 | P | CANC |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dan Hardisty Inspection cancelled from web by: Dan Hardisty
|
Electrical Rough-In | 10/11/2005 | 10/12/2005 | 10/12/2005 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/11/2005 at 4:07:41 PM. talked with contr, gave ok to cover front half clg, left corr notice for back 1/2 clg. 110.26(F)(1)(b) protection shall be installed to avoid damage to elect equip in dedicated space. Also wrote corr notice to Bld05-00311- nec 800.24 Comm cables shall be installed in workmanlike manner and supported by straps,staples, hangers or similar fittings and installed so as to not damage the cable.
|
Conference | 10/5/2005 | 10/6/2005 | 10/6/2005 | A | DONE |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/5/2005 at 1:08:59 PM. Contact: ###-####. talked about enclosures for steam press area
|
Electrical Rough-In | 9/30/2005 | 10/3/2005 | 10/3/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/30/2005 at 2:05:03 PM. ###-####. ok to cover bath walls and column in front area, hall area walls too.
|
Rough-In Permanent Service | 9/19/2005 | 9/20/2005 | 9/20/2005 | A | PASS |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 9/19/2005 at 8:18:27 AM. Contact: ###-####. P/S U/G N Ok this is for 2 meters
|
Electrical Rough-In | 9/8/2005 | 9/9/2005 | 9/9/2005 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/8/2005 at 2:27:51 PM. Contact: ###-####. partial on walls aNd hardlids
|
Electrical Rough-In | 8/31/2005 | 8/31/2005 | 8/31/2005 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 8/31/2005 at 10:24:04 AM. Contact: ###-####. u/g ok
|
Application received | | | 8/31/2005 | | |
|
|
|
|
Issue permit | | | 8/31/2005 | | DONE |
|
|
|
|