Second Notice ELE | 7/6/2006 | 7/6/2006 | 7/10/2006 | | DONE |
|
|
|
This permit finaled on the web by Jeff Durham
|
First Notice | 6/5/2006 | 6/5/2006 | 7/6/2006 | | DONE |
William E Thomas
|
|
|
|
Final | 6/3/2006 | 6/5/2006 | 6/5/2006 | P | PASS |
William E Thomas
|
|
|
Elevator work complete. Please call Paul Burke at ###-#### to coordinate time to meet at site so elevator can be moved to review work; Phone #: ###-#### Internet Inspection Request from: Jeff Durham final ok
|
Final | 5/16/2006 | 5/18/2006 | 5/18/2006 | P | NR |
Pat Lass
|
|
|
To finalize elevator electical portion. Please call Paul Burke with EKC at 629-946 to advise of time for access to elevator. Please call me at ###-#### if any questions.; Phone #: ###-#### Internet Inspection Request from: Jeff Durham no recep or light in mach. area 620.23
|
ELE-Aging Inspection | 5/8/2006 | 5/8/2006 | 5/12/2006 | | NR |
Pat Lass
|
|
|
suc
|
Final | 3/6/2006 | 3/7/2006 | 3/7/2006 | P | NR |
Pat Lass
|
|
|
Paul Burke is on site off and on for the GC. He said he would meet you there if desired. His phone is ###-####. For any questions on our work call Perry Huston at ###-####.; Phone #: ###-#### Internet Inspection Request from: Jeff Durham this is not finished for the elevator and we could not access the pit.
|
ELE-Aging Inspection | 3/6/2006 | 3/6/2006 | 3/7/2006 | | NR |
Pat Lass
|
|
|
suc
|
Final | 12/15/2005 | 12/16/2005 | 12/16/2005 | P | PART |
Pat Lass
|
|
|
george; Phone #: ###-#### Internet Inspection Request from: Barbara Moore signed T/O man lift is all that remains
|
Electrical Rough-In | 12/9/2005 | 12/12/2005 | 12/12/2005 | A | PASS |
Bob Reichert
|
|
|
downstairs//george; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to cover basement ceiling
|
Electrical Rough-In | 12/1/2005 | 12/2/2005 | 12/2/2005 | P | PASS |
William E Thomas
|
|
|
ceiling insp--george ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 1st floor ok to cover grid
|
Permanent Service | 11/4/2005 | 11/7/2005 | 11/7/2005 | A | PART |
Mike Kinnear
|
|
|
Contact is Perry. Please arrive 1st thing Monday morning for inspection as we will have Idaho Power on standby for a re-connection once inspection takes place.; Phone #: ###-#### Internet Inspection Request from: David Bonner oked service need to look at all sub panels for seperation ground & neut. 370 oked part ceiling foiled scrim. upstaiirs only p/s u/g reconnect ok
|
Conference | 10/11/2005 | 10/12/2005 | 10/12/2005 | P | PART |
Pat Lass
|
|
|
would like 1pm if possible///paul; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa talked about clearances gutters and service
|
Electrical Rough-In | 10/12/2005 | 10/12/2005 | 10/12/2005 | P | PART |
Pat Lass
|
|
|
would like 1pm if possible///paul; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa basement walls ok
|
Electrical Rough-In | 9/29/2005 | 9/30/2005 | 9/30/2005 | A | PASS |
William E Thomas
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Barbara Moore upstairs walls only ok for cover, no cielieng as of yet.
|
Application received | | | 9/16/2005 | | DONE |
|
|
|
This permit was created on the web by David Bonner
|