Third Notice ELE | 11/10/2005 | 11/10/2005 | 12/6/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice ELE | 10/26/2005 | 10/26/2005 | 11/10/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 10/14/2005 | 10/14/2005 | 10/26/2005 | | DONE |
Bob Reichert
|
|
|
|
Final | 10/14/2005 | 10/14/2005 | 10/14/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/14/2005 at 6:02:39 AM. Contact: ###-####. corr made, told elect to id ceiling wires, ok to final
|
Final | 10/12/2005 | 10/12/2005 | 10/12/2005 | P | FAIL |
Bob Reichert
|
|
|
###-#### - doug called, left message, left corr notice, 330.24(B) mc cable shall be strapped within 12" of box and 6' intervals, 408.4 panel schedule not explicit, BCC need to see ceiling
|
Final | 10/11/2005 | 10/11/2005 | 10/11/2005 | P | NR |
Bob Reichert
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles still has some finish work to do
|
Electrical Rough-In | 9/22/2005 | 9/23/2005 | 9/23/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/22/2005 at 4:28:47 PM. Contact: ###-####. ok to cover walls only, east wall to be removed in large room
|
Electrical Rough-In | 9/21/2005 | 9/22/2005 | 9/22/2005 | A | FAIL |
Bob Reichert
|
|
|
###-#### - doug called left message, left corr notice,330.30(B) mc cable shall be strapped within 12" of boxes, and at 6' intervals, 110.12(A) unused openings shall be closed
|
Electrical Rough-In | 9/21/2005 | 9/21/2005 | 9/21/2005 | P | NH |
Bob Reichert
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore called contr, they will recall
|
Application received | | | 9/21/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/21/2005 | | DONE |
|
|
|
|