Final | 9/2/2009 | 9/3/2009 | 9/3/2009 | P | PASS |
Doug A Poedy
|
|
|
Mitch Phone #: ###-####. Ok final.
|
DOC - Permit Finaled | 9/3/2009 | 9/3/2009 | 9/3/2009 | P | PASS |
Doug A Poedy
|
|
|
|
Conference | 5/21/2009 | 5/22/2009 | 5/22/2009 | A | DONE |
Bob Reichert
|
|
|
john Phone #: ###-#### called, told owner that all electrical work must be done before can final, and that electrical contractor will call in when done
|
Final | 10/10/2008 | 10/13/2008 | 10/13/2008 | A | PART |
Pat Lass
|
|
|
mitch Phone #: ###-#### all ok except kitchen not done yet
|
Final | 9/29/2008 | 10/3/2008 | 10/3/2008 | A | NH |
Jack Frank
|
|
|
mitch Phone #: ###-#### called notice posted
|
Reinspection Fee (no hold) | 10/3/2008 | 10/3/2008 | 10/3/2008 | A | DONE |
Jack Frank
|
|
|
mitch Phone #: ###-#### fee due no access
|
Electrical Rough-In | 1/26/2006 | 1/27/2006 | 1/27/2006 | P | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 1/26/2006 at 5:14:46 PM. Contact: ###-####. part 3 rooms ok to cover, will check more as job develops
|
Conference | 1/19/2006 | 1/19/2006 | 1/19/2006 | P | PART |
Pat Lass
|
|
|
Mitch; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong job will be in stages
|
Permanent Service | 9/28/2005 | 10/3/2005 | 10/3/2005 | P | PASS |
Bob Reichert
|
|
|
mitch ###-#### p/s u/g exst reconnect ok
|
Application received | | | 9/28/2005 | | |
|
|
|
|
Issue permit | | | 9/28/2005 | | DONE |
|
|
|
|