Permit Information
Permit NumberELE05-03796
StatusFinaled
Name JOHNSON JOEL M
Site Address 1517 S LONGMONT AVE
Project Name 
Customer Number 
ePlanReview 
Description
Per Mike Kinnear void permit, homeowner cannot do wiring needs to hire contractor to do job, if any questions call Mike K.///10/20/05 LEG ///per Jim S. re-open permit 10/24/05 LEG
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final10/25/200510/25/200510/25/2005PPASS
DetailsMike Kinnear
joel; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok final
Permanent Service10/24/200510/25/200510/25/2005AFAIL
DetailsMike Kinnear
JOEL//please call 30 min prior; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ground wire from water pipe has to go to main service. bond hot & cold water pipes
Permanent Service10/25/200510/25/200510/25/2005PPASS
DetailsMike Kinnear
joel; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles p/s o/h reconnect ok
Change Status to I  10/24/2005  
per Jim Schmer ok to reopen 10/24/05 LEG
Final10/20/200510/20/200510/20/2005PFAIL
DetailsMike Kinnear
joel; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles t/w owner he needs an electrical contractor to do service. sub panal so messed up it needs to be replaced. (note almost all the bottom of panal cut out. grounds & neut. not sperated) can not run 4 wires for service connection, needs to be 3 wires sun light resistant type. grounding not done correct (needs #6cu wire to ground rods) need to connect water system for grounding electrode.
VOIDED CHANGE STATUS  10/20/2005 DONE
Per Mike Kinnear void permit, homeowner cannot do wiring needs to hire contractor to do job, if any questions call Mike K.///10/20/05 LEG
Application received  10/18/2005  
Issue PAID IN FULL permit  10/18/2005 DONE