Second Notice ELE | 2/27/2006 | 2/27/2006 | 3/9/2006 | | DONE |
|
|
|
This permit finaled on the web by Todd Holbrook
|
First Notice | 2/16/2006 | 2/16/2006 | 2/27/2006 | | DONE |
Jack Frank
|
|
|
|
Final | 2/16/2006 | 2/16/2006 | 2/16/2006 | P | PASS |
Jack Frank
|
|
|
Jeremy; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok card signed
|
Final | 2/2/2006 | 2/3/2006 | 2/3/2006 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/2/2006 at 3:13:50 PM. Contact: ###-####. signed to card, elev permit #05-02463 not ready, 590.2(B) & (D) temporary heater wiring shall be removed when ti spaces permitted
|
Final | 2/1/2006 | 2/1/2006 | 2/1/2006 | P | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/1/2006 at 7:45:45 AM. Contact: ###-####. talked about ti spaces and power for heaters, told to run temporary until ti spaces are ready.
|
Rough-In Permanent Service | 2/1/2006 | 2/1/2006 | 2/1/2006 | P | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/1/2006 at 7:44:46 AM. Contact: ###-####. nr talked about ti spaces
|
Final | 1/24/2006 | 1/25/2006 | 1/25/2006 | A | CANC |
Bob Reichert
|
|
|
Jeremy -- call 1st before insp for ceiling grid; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong see ri
|
Electrical Rough-In | 1/25/2006 | 1/25/2006 | 1/25/2006 | A | PASS |
Bob Reichert
|
|
|
Jeremy -- call 1st before insp for ceiling grid; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok to cover ceiling
|
Final | 1/23/2006 | 1/24/2006 | 1/24/2006 | A | CANC |
Mike Kinnear
|
|
|
Jeremy -- final for ceiling grid -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong wrong type inspection
|
Electrical Rough-In | 1/24/2006 | 1/24/2006 | 1/24/2006 | P | FAIL |
Mike Kinnear
|
|
|
Jeremy -- final for ceiling grid -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong no border tiles shall be installed. remove tiles & recall for inspection
|
Rough-In Permanent Service | 12/16/2005 | 12/16/2005 | 12/16/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/16/2005 at 7:01:33 AM. Contact: ###-####. ri to panel ok, p/s, add meter to exst meter pak, n, ok
|
Electrical Rough-In | 12/12/2005 | 12/14/2005 | 12/14/2005 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/12/2005 at 7:45:01 AM. Contact: ###-####. soffits ok to cover
|
Electrical Rough-In | 12/8/2005 | 12/9/2005 | 12/9/2005 | A | PART |
William E Thomas
|
|
|
jeremy Note: ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover, needs to have show window oulets for final
|
Electrical Rough-In | 12/7/2005 | 12/8/2005 | 12/8/2005 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/7/2005 at 3:25:11 PM. Contact: ###-####. left corr notice, met elect, 210.62 showroom recpts shall be installed
|
Final | 12/1/2005 | 12/1/2005 | 12/1/2005 | P | CANC |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Holbrook see ri
|
Application received | | | 12/1/2005 | | DONE |
|
|
|
This permit was created on the web by Todd Holbrook
|
Electrical Rough-In | 12/1/2005 | 12/1/2005 | 12/1/2005 | P | PART |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Holbrook walls only ok to cover, called contr to strap 1 set mc cable from box and a couple 1 1/4" areas. Panel not set, will recall to inspect ltr.
|