Final | 7/17/2006 | 7/18/2006 | 7/18/2006 | A | PASS |
Pat Lass
|
|
|
final on bath remodel Internet Inspection Request from: Andy Rose
|
Electrical Rough-In | 1/17/2006 | 1/20/2006 | 1/20/2006 | A | PASS |
Pat Lass
|
|
|
need inspection on floor heating matt before covered with tile. Internet Inspection Request from: Andy Rose
|
Conference | 12/30/2005 | 12/30/2005 | 12/30/2005 | P | DONE |
Jack Frank
|
|
|
per your request ok met with allstate and western elect, western elect. pm#ele05-04615 r/i and final ok allstate is taking over the job
|
Conference | 12/30/2005 | 12/30/2005 | 12/30/2005 | P | DONE |
Jack Frank
|
|
|
conference ok met with allstate and western elect note allstate is taking over job western elect. pm#ele05-04615 has had r/i ok and finaled
|
Electrical Rough-In | 12/21/2005 | 12/23/2005 | 12/23/2005 | A | NR |
Pat Lass
|
|
|
repair existing wiring in hallway remodel Internet Inspection Request from: Andy Rose a lot of wiring has been done without a permit on this job and I posted a correction to this address giving 10 days to take action. all unlawful wiring shall be uncovered for inspection and a permit for all unlawful work. the panel installed in the basement hasn't enough working clearance. COW
|
Conference | 12/23/2005 | 12/23/2005 | 12/23/2005 | P | PART |
Pat Lass
|
|
|
discussed opening walls
|
Application received | | | 12/2/2005 | | DONE |
|
|
|
This permit was created on the web by Andy Rose
|