Final | 2/28/2008 | 2/28/2008 | 2/28/2008 | P | PASS |
Bob Reichert
|
|
|
Eric Phone #: ###-#### corrections made, ok to final
|
Final | 2/27/2008 | 2/27/2008 | 2/27/2008 | P | FAIL |
Bob Reichert
|
|
|
james Phone #: ###-#### called, left correction notice, NEC 408.4 shall provide circuit directory that is clear, concise, and explanatory for each circuit, 408.38 panelboard shall be dead-front, cover installed
|
Electrical Rough-In | 2/15/2008 | 2/15/2008 | 2/15/2008 | P | PASS |
Bob Reichert
|
|
|
james Phone #: ###-#### ric ok
|
Permanent Service | 2/15/2008 | 2/15/2008 | 2/15/2008 | P | PASS |
Bob Reichert
|
|
|
james Phone #: ###-#### p/s o/h n ok
|
Rough-In Permanent Service | 2/13/2008 | 2/13/2008 | 2/13/2008 | P | CANC |
Bob Reichert
|
|
|
call 1st before insp -james Phone #: ###-#### see conference
|
Conference | 2/13/2008 | 2/13/2008 | 2/13/2008 | P | DONE |
Bob Reichert
|
|
|
call 1st before insp -james Phone #: ###-#### met owner, talked about concrete encased electrode, service disconnect, 6" free conductor length, ri work, height for breaker handles
|
Application received | | | 2/3/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/3/2006 | | DONE |
|
|
|
|